- Find scintillator problem because of overflow of left TDC of S2.
- Try to know if they are good or bad events.
Wednesday, October 27, 2010
Friday, October 22, 2010
DB updated
- The optics replay took so long time that it delays DB update for one day. Now here it is.
- I also update the doc part for CSR package. SVN out. ^_^
Thursday, October 21, 2010
Optics Update
- Finish optics for right arm. Now replaying for final check.
- Find problem with scintillator. Will post on elog to discuss with other guys.
Wednesday, October 20, 2010
Update for today
- Need to figure out what causes beta=0 for right arm scintillator
- Fix Sim_Cor bug in Acceptance.C (Thank xinhu)
- Generate doxygen code for CSR_Run.h, Calibrate_Scin.C, Acceptance.C, CSR.h
- Change Dx Dy of 1646 MeV for left arm in def_optics.h and def.h of halog
- Finish organizing the 1102 optics for right arm
- SVN not committed yet. Once optics for right arm is done, I will do that.
Tuesday, October 19, 2010
Left Arm optics update
- Replay 646 MeV optics to get correct original root file from which I will extract info.
- Get optics for all energy setting including 399 MeV
- Extrapolate 200 MeV optics from existing
- Update Dx Dy in def_optics.h and generate_autodb.pl, add L.vdc.config=200 option for momentum setting
- Generate new db_run.dat, move to $DB_DIR
- Replay new root and generate 01_Optimized.ps in result dir
- Fix blog tutorial of cakephp, just use 1.2 tutorial not 1.3
- add deline in c.snippet for vim, temporally fix minibufexplorer .file bug
Subscribe to: